Clapham One
U+I Group transform areas of towns and cities into thriving communities and neighbourhoods, with a portfolio of mixed- use regeneration projects within London, the south-east, Manchester and Dublin.
In 2012, together with joint venture partners United House, U+I Group delivered a landmark £80m mixed-use regeneration scheme which has transformed leisure services across two sites in Clapham town centre, south west London.
The Public Private Partnership (PPP) scheme provided Clapham with a new highly-sustainable leisure centre, a state-of-the-art library, a family health centre and high-quality residential accommodation, including affordable housing in partnership with Notting Hill Housing Group.
The PPP deal meant that in the depths of the recession, U+I were able to secure £35 million funding for this important project, including loan funding from the Homes and Communities Agency's Kickstart programme, pre-sell £46 million of the development, and guarantee the London Borough of Lambeth a brand new library and leisure centre funded entirely from the sale of the private sector element of the development.
Mary Seacole House on Clapham High Street was replaced by The Library Building, designed by Studio Egret West. The ground floor and basement is based around an audacious spiral design, connecting to the new health centre, a café, performance space and community rooms, reinforcing the community spirit of the development.
The old Clapham Swimming Pool on Clapham Manor Street was replaced with a brand new sustainable leisure centre designed by LA Architects. Facilities include a 6-lane, 25m swimming pool, a much larger fitness suite, a 4-court sports hall, climbing wall and community rooms. The leisure centre opened to the public in December 2011.
Also located on this site is The Manor Building (19 private homes) and 4 Bicycle Mews (44 affordable homes in partnership with Notting Hill Housing Group) both completed in July/August 2011.
Clapham One was awarded Best Mixed-use Development at the International Property Awards 2011 as well as 11 other awards for its architecture, housing design and the quality of its facilities.
Project data:
- Date acquired: 2007
- Date completed: 2012
- Development value: £80 million
- Architect: Studio Egret West, DLA Architecture, LA Architects, ABIR
- Development partners: London Borough of Lambeth
--U and I
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Algarve House, Southwark.
- Articles by U and I.
- Blackhorse Road regeneration.
- Cathedral Group.
- Circus Street, Brighton.
- Cockpit Yard.
- Development Securities.
- Mixed-use development.
- Placemaking.
- Preston Barracks, Brighton.
- Public private partnership.
- Regeneration.
- Skipton House project.
- The Deptford Project.
- The Movement, Greenwich.
- U and I.
- UandI Think event with John McDonnell MP.
[edit] External references
- [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DThenewclapham.com%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|The New]] [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DThenewclapham.com%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Clapham]]
- U and I Plc - Clapham One
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.